Studies had indicated that the critical stretch
of Sungai Klang between Sg Klang /Sg Ampang confluence
and Sg Gombak/ Sg Klang confluence to be flood prone
areas and the fact that the river is further constrained
by the Jalan Tun Perak Bridge (near Masjid Jamek)
which is low, has resulted in the surrounding areas
to experience flash floods.
The SMART system will be able to divert large volumes
of flood water from entering this critical stretch
via a holding pond, bypass tunnel and storage reservoir.
This will reduce the flood water level at the Jalan
Tun Perak Bridge, preventing spillover.
Other benefits of SMART
The Stormwater Management and Road
Tunnel (SMART) project was incepted by the project
proponent, namely MMC Berhad-Gamuda Berhad Joint
Venture, primarily to mitigate the recurring floods
in the city of Kuala Lumpur, the financial, business
and commercial hub of Malaysia. However, at the
design stage of SMART, the dual purpose concept
was born from the ingenuity of the project proponents
and the motorway tunnel was integrated into the
system to relieve traffic congestion at the main
Southern Gateway to the city centre. |
|
The Motorway to Ease Congestion
The motorway tunnel will provide an alternative route
for motorists from the Southern Gateway, i.e. KL-Seremban
Highway, Federal Highway, Besraya and East-West Link
entering and exiting the city centre. This will reduce
traffic congestion at the Southern Gateway leading
to the city centre. The travel time will be reduced
significantly. For example from the Jalan Istana Interchange-Kampung
Pandan the expected travel time is a mere four minutes
compared to ten to fifteen minutes using the existing
roads.
|