The slurry shield tunnel boring machine consists of four main
parts.
The first is the Rotary Cutter Head with tungsten pick bits
used for excavation of soil and disc cutters used for the
excavation of rock.
The second part of the machine is the Bulkhead located immediately
behind the Rotary Cutter Head. This is where the pressured
bentonite slurry shield is formed to provide stability during
the tunnel excavation.
The third part of this machine consists of hydraulic rams,
which are used to propel the machine forward and to keep the
tunnel in its right alignment.
The fourth and the last main part of the machine is the tunnel
lining erector used to install the pre-cast concrete lining
of the tunnel.
Other parts complementing the main Special Features are
two boogies on rails that house electrical, slurry pumping,
ventilation equipment
and cable and pipes.
Initial TBM boring.

TBM advances ahead.

Installation of segment lining.
The pre-cast concrete linings for the tunnel are transported
continuously to the erector by boogies on rails. These linings
are then hoisted and placed in the correct position in the
tunnel with the help of vacuum pads attached to hydraulics
arms. The arms are ex tended to keep the linings in place
while the linings are bolted together.
The void between the excavated ground surface and the linings
is immediately filled with cement mortar grout under pressurized
conditions to ensure all the voids are fully filled.
For SMART, two Slurry Shield machines are used, both starting
from the JKR field area in Jalan Chan Sow Lin. The first machine
will head North under Jalan Tun Razak and Jalan Desa Pandan
before terminating at the pond at Ampang behind
Gleneagles Hospital.
The second machine will head south under the Jalan Chan Sow
Lin and the KL-Seremban Highway next to the Sg Besi airfield
before terminating at the existing pond in Taman Desa.

|