SMART - Stormwater Management And Road Tunnel (SMART)
DID LLM
 
Notice. What to know more about the construction of SMART?
 
Happenings
 

< Back To Happenings

  Visit by Pars Oil & Gas Co., Iran  



Encik Wan Azhar (PR Manager) briefed the delegates on the SMART Tunnel alignment at the 3D model.


At the end of the visit, Encik Wan Azhar presented a momento to HE Dr Ali Vakili.

6 representatives from Pars Oil & Gas Co., Iran, led by HE Dr Ali Vakili, paid us a visit to SMART on 8 January 2008, to understand the concept and its procedure. The group was shown the operation video as well as the Motorway Control Room.

Ms Chew Ee Lean (Maintenance & Engineering Manager) responded questions regarding the construction and tunnel design. The group was on a 4 days working visit to Malaysia.



< Back To Happenings | ^ Back To Top

 
 
SMART © Copyright Protected. Powered by Three Sixty Technologies.